COLD STORE
Flow: 100 m³/hour – Final DBO before: 300 – Final DBO after 51 – upon a 90-day period.
SLAUGHTERHOUSE OF POULTRIES
Flow: 250m³/hour – Final DBO before: 350 – Final DBO after 62 – upon a 75-day period.
ACTIVATED SLUDGES – BIODIESEL
Flow: 80m³/hour – Final DBO before: 1,980 – Final DBO after 110 – upon a 120-day period.
REDUCTION IN TREATMENT POND SLUDGE VOLUME
Results after a 180-day period from the product application.
ACCUMULATION TANK, REACTORS AND EQUALIZATION TANK
Equalization Tank – Industry flow: 300 m³/hour – after a 60-day period.
COMPOSTING SOLUTIONS
Composting – 50 tons / day.
ANAEROBIC REACTORS
Composting – 50 tons / day.
BIODIGESTORS
Potato Starch Mills, Cornstarch Mills and Flour Starch Mills.
BIOGAS
CORNSTARCH MILL
60m³/hour – Final DBO before: 459 – Final DBO after 54 – upon a 90-day period
POTATO STARCH MILL
30m³/hour – Final DBO before: 412 – Final DBO after 39 – upon a 70-day period.